MVR's published workflow

A finished surface starts with decisions below grade.

MVR's current process covers design, materials, scheduling, excavation, compaction, bedding, paver installation and joint finishing.

PLAN

Measure + design

Confirm dimensions, layout and project requirements. MVR offers an in-person estimate route when measurements are not already known.

MATERIAL

Select the stone

Choose paver type, colour and make. MVR's published process has clients pay material suppliers directly rather than through a materials markup.

SCHEDULE

Book the work

MVR publishes a no-deposit booking model and coordinates project timing with material deliveries and weather.

BUILD

Install to the base

Excavation, compaction, aggregate lifts, bedding, paver placement, restraint, joint material and final activation are handled as a structured sequence.

Installation depth

The foundation is part of the sales conversation.

MVR explicitly publishes deeper minimums than common manufacturer guidance: 12 inches for walkways/patios and 18 inches for vehicular applications, with more depth recommended in newer developments.

Final excavation and engineering requirements can vary by property, soil, drainage, municipal requirements and project type. Confirm site-specific details directly with MVR.

Subsurface heating infrastructure during MVR Landscaping installation

Repair work

Not every failed surface needs a brand-new design.

MVR also publishes a repair workflow for existing interlocking: diagnose the problem, estimate the repair, schedule the work and relay or replace material as needed.

MVR Landscaping interlocking repair and relay project